Perseus maintains an active FFF replacement program for legacy military cooling hardware where original supply chains have been discontinued. Each replacement engagement follows a structured audit process:
Mechanical audit: Mounting footprint, bolt pattern, envelope dimensions, connector location
Electrical audit: Voltage rating, connector type and pinout, PWM control protocol, FG signal output
Aerodynamic audit: P-Q curve matching across the operating impedance range of the host system
Environmental audit: Confirmation that the replacement unit meets or exceeds the original unit's environmental qualification basis
No system modifications are required for a qualified FFF replacement. Perseus has completed FFF replacement programs for Ametek Rotron legacy models across multiple platform types.
For obsolescence management inquiries: Perseus can provide a direct FFF audit against a supplied legacy part number or physical unit. Lead time for standard FFF replacements is typically 7–9 weeks from audit completion.
This document reflects Perseus internal validation data and engineering design rationale. It is not a substitute for formal qualification test reports or program-specific certification documentation. For datasheet requests, test report availability, or qualification planning support, contact the Perseus applications engineering team.